In 2015 the Glasgow Royal Concert Hall was renovated and Triple E was chosen to design and install the 22 Acoustic Varibanners necessary to produce the fine-tuneable acoustics required in the new auditorium.
In 2015 the Glasgow Royal Concert Hall was renovated and Triple E was chosen to design and install the 22 Acoustic Varibanners necessary to produce the fine-tuneable acoustics required in the new auditorium.